Monday, 2 December 2013

Filming schedule / Risk Assessment - Miss Georgiou

The purpose of the risk assessment task was to ensure that all members of the group would be safe while filming. To make sure of this we had to make sure any dangers that may occur during filming were dealt with, for example using knives in public and tripping on any leads. To avoid these hazards we came up with a prevention for each one.

We made a filming schedule, this was a rough copy of the timings when we planned to film. The filming schedule also included the location, what we was filming, and the equiptment we would be needing. This schedule was helpful as it allowed us to keep organised and we knew what we was doing on each day. Although we didnt entirely stick to the filming schedule it was still extremely helpful.

Description of hazard
Prevention of hazard
Trailing leads while filming
Use gaffer tape to secure leads
Using knives in public.
Take care about where we film.
Getting run over.
Be careful when crossing roads with equiptment.
Tripod falling over.
Make sure it is carefully balanced at all times.
Dropping the camera during handheld.
Make sure it is always straoped to your hand.

 

 

 

 

 

Shot
Date & time
Location
Content /Action
Shot type & Duration
Costume/ hair/ make up
Iconography
Personnel
Equipment
1
17.11.2013
5:00pm
Repton Park
Filming the large tower in order to set the scene.
 
 
Extreme long shot into a pan, for approx. 4 seconds.
None
None
Cameraman
Location manager
 
Digital camera, Tripod, Street Lights.
2
17.11.2013
5:15pm
 
Repton Park
Filming the victim saying goodbye to her boyfriend after a night out on Halloween.
Long shot, approx. 5 seconds.
Girly outfit, Hair up.
Phone and Handbag.
Cameraman
Location manager
Actors
Digital camera, Tripod, Street lights.
3
17.11.2013
5:30pm
 
Repton Park
Filming the victim on her way home.
Mid shot, approx. 3 seconds.
Girly outfit, Hair up.
Phone and Hanbag.
Cameraman
Location Manager
Actor
Digital camera, Tripod.
4
17.11.2013
5:45pm
 
 
Repton Park
Filming girl texting her Mum when she will be home.
Close up, approx. 5 seconds.
None
Phone,
Cameraman
Actor
Digital camera
5
17.11.2013
6:00pm
 
Repton Park, underground car park.
Filming girl walking and then mysterious figure appears.
Long shot approx. 5 seconds.
Girly outfit, hair up.
Phone, Handbag, Mask.
Cameraman
Location manager
Actors
Digital camera, tripod.
6
17.11.2013
6:15pm
Repton park underground car park.
Filming the antagonist walking towards the girl.
Over the shoulder shot approx. 5 seconds.
All black outfit.
Mask, Knife.
Cameraman
Location manager
Actors
Digital camera, Tripod.
7
17.11.2013
6:30pm
Repton park underground car park
Filming the girl looking shocked and scared.
Close up approx. 4 seconds
Hair up, make up on.
None.
Cameraman
Location manager
Actors
Digital camera, Tripod.
 
 
 
 
 
 
 
 
 
8
18.11.2013
5:00pm
Repton Park, field
Filming the girl running
POV, approx. 4 seconds.
None
Shoes.
Cameraman
Actor
Digital camera.
9
18.11.2013
5:15pm
Repton Park field
Filming the girl being captured
POV approx. 2 seconds
None
None
Cameraman
 
Digital camera, bin bag.

                                                                                                                                                                                                                                           

 

 

 

1 comment:

  1. This post demonstrates some understanding of what a filming schedule and risk assesments are. You have made a start in explaining the purpose of both, but further analysis and description of the how the two tables assisted you with planning your thriller is needed, to demonstrate further understanding of planning.

    ReplyDelete