We made a filming schedule, this was a rough copy of the timings when we planned to film. The filming schedule also included the location, what we was filming, and the equiptment we would be needing. This schedule was helpful as it allowed us to keep organised and we knew what we was doing on each day. Although we didnt entirely stick to the filming schedule it was still extremely helpful.
|
Description
of hazard
|
Prevention
of hazard
|
|
Trailing leads while filming
|
Use gaffer tape to secure leads
|
|
Using knives in public.
|
Take care about where we film.
|
|
Getting run over.
|
Be careful when crossing roads with
equiptment.
|
|
Tripod falling over.
|
Make sure it is carefully balanced at
all times.
|
|
Dropping the camera during handheld.
|
Make sure it is always straoped to
your hand.
|
|
Shot
|
Date & time
|
Location
|
Content /Action
|
Shot type & Duration
|
Costume/ hair/ make up
|
Iconography
|
Personnel
|
Equipment
|
|
1
|
17.11.2013
5:00pm
|
Repton Park
|
Filming the large
tower in order to set the scene.
|
Extreme long shot
into a pan, for approx. 4 seconds.
|
None
|
None
|
Cameraman
Location manager
|
Digital camera,
Tripod, Street Lights.
|
|
2
|
17.11.2013
5:15pm
|
Repton Park
|
Filming the victim
saying goodbye to her boyfriend after a night out on Halloween.
|
Long shot, approx. 5
seconds.
|
Girly outfit, Hair
up.
|
Phone and Handbag.
|
Cameraman
Location manager
Actors
|
Digital camera,
Tripod, Street lights.
|
|
3
|
17.11.2013
5:30pm
|
Repton Park
|
Filming the victim
on her way home.
|
Mid shot, approx. 3
seconds.
|
Girly outfit, Hair
up.
|
Phone and Hanbag.
|
Cameraman
Location Manager
Actor
|
Digital camera,
Tripod.
|
|
4
|
17.11.2013
5:45pm
|
Repton Park
|
Filming girl texting
her Mum when she will be home.
|
Close up, approx. 5
seconds.
|
None
|
Phone,
|
Cameraman
Actor
|
Digital camera
|
|
5
|
17.11.2013
6:00pm
|
Repton Park,
underground car park.
|
Filming girl walking
and then mysterious figure appears.
|
Long shot approx. 5
seconds.
|
Girly outfit, hair
up.
|
Phone, Handbag,
Mask.
|
Cameraman
Location manager
Actors
|
Digital camera,
tripod.
|
|
6
|
17.11.2013
6:15pm
|
Repton park
underground car park.
|
Filming the
antagonist walking towards the girl.
|
Over the shoulder
shot approx. 5 seconds.
|
All black outfit.
|
Mask, Knife.
|
Cameraman
Location manager
Actors
|
Digital camera,
Tripod.
|
|
7
|
17.11.2013
6:30pm
|
Repton park
underground car park
|
Filming the girl
looking shocked and scared.
|
Close up approx. 4
seconds
|
Hair up, make up on.
|
None.
|
Cameraman
Location manager
Actors
|
Digital camera,
Tripod.
|
|
|
|
|
|
|
|
|
|
|
|
8
|
18.11.2013
5:00pm
|
Repton Park, field
|
Filming the girl
running
|
POV, approx. 4
seconds.
|
None
|
Shoes.
|
Cameraman
Actor
|
Digital camera.
|
|
9
|
18.11.2013
5:15pm
|
Repton Park field
|
Filming the girl
being captured
|
POV approx. 2
seconds
|
None
|
None
|
Cameraman
|
Digital camera, bin
bag.
|
This post demonstrates some understanding of what a filming schedule and risk assesments are. You have made a start in explaining the purpose of both, but further analysis and description of the how the two tables assisted you with planning your thriller is needed, to demonstrate further understanding of planning.